Sunday, July 13, 2008

House update

I wish I could say we were on the homestretch, but we have lots more work to do. A lot has been completed though!
-Land excavated and leveled
-Foundation poured
-Cripple wall constructed
-Floor joisted installed
-Subfloor done
-Framing complete
-Trusses hoisted
-Rafters in
-Roof Sheathing done
-Wall Sheathing in
-Holes for electrical drilled
-Roof weather-proofed
-Shingles halfway up!
-Tub received (cracked!) and returned
Enjoying our cracked tub before it had to be returned...woowee, can't wait to soak in that!
Backside of the house, with shingles

Neato weave pattern in the valley of the roof


Peaks and valleys

1 comment:

jayme said...

may I please come over and soak in that amazing tub?

I am totally amazed at how much you guys have accomplished. It looks great!